Refinery Pipeline Replacement
- Replacement of existing, aging crude oil piping
- Rerouting of pipe as required
- Installation of above and below ground piping
- New dock loading/unloading arms for ships
- On site field work to document existing equipment locations
- Piping design
- Pipe stress analysis
- Preparation of line lists
Startup in summer 2007
|
|

Pump station
|
JHI Engineering provided mechanical piping design for the replacement of existing
piping in the refinery. Pipelines were above and below ground. The buried piping
included the crossing of two major roadways and a rail line. New piping and pump
stations were designed for the new storage tanks.
Significant time was spent developing background drawings for the large site. Many
of the piping runs were well over 100 feet long.
JHI provided permitting assistance to work with the required agencies to obtain
permits to cross the roadways, rail line and waterways.
|