Water Treatment Facility
Related Projects:    Plant Expansion   |   Custom Machinery   |   Water Treatment   |   Material Handling   |   Municipal Composter
Project Features
  • 600 gpm reverse osmosis electro deionization ultra-pure water treatment system
  • 7,700 sq ft pre-engineered metal building
  • 100,000 gallon deionized water tank
  • 4160V electric service, 4 MVA double-ended substation
  • Electrical Room
Services by JHI
  • Project Management
  • Process Engineering
  • Structural Engineering
  • Civil Engineering
  • Mechanical Engineering
  • Electrical Engineering
  • Instrumentation Engineering
  • Construction Documents
  • Procurement
  • Permit Acquisition
  • Commissioning and Startup Assistance
  • Construction Management
Project Cost
$10 million

Project Completion
2002
Water Treatment Facility
Water Treatment Facility under construction in 2002

On an extremely compressed schedule, JHI provided design, cost estimation, permitting, procurement, construction management, and commissioning and startup assistance for a water treatment plant to support a new power generation facility. This $10 million dollar turn-key project required JHI to utilize all engineering disciplines and to maintain excellent communication with the client in order to complete the project within the limited time frame. Strong project and construction management provided by JHI enabled this job to be so successful. JHI’s work included:
  • Facility design
  • Metal building system specification
  • Pile-supported two-way slab design
  • 4,800 feet of underground piping
  • Tank, pump, and equipment specification and procurement
  • Process piping design
  • HVAC design
  • Fire protection system specification
  • New electric service, substation, switchboard, and Electrical Room
  • Instrument loop diagrams